Russia, 2015
Igorevsky woodworking plant

In 2015 CJSC DAKOTRANS, assisted by the head office DAKOWORLD Duseldorf, handled the transport of the laminate production line equipment and machinery to IGOREVSKY Woodworking plant, Smolenskaya oblast, Igorevskaya town, Russia.
Total scope of the shipment made nearly 451 tons and 7000 cubic meters. The mixing chamber was the most complicated unit in terms of the carriage, It was 8.4 meters in length , 4.7 meters in width and 4.8 meters in height.This package was transported from Budapest, Hungary, to Russia multimodally. It was first shipped by a barge, then by a ferry, with a further haulage by a lowbed trailer up to the jobsite. The shipment was delivered successfuly and according to the agreed schedule.


