Russia, 2014
Samara
In 2014 CJSC DAKOTRANS carried out dismantling and transport of the four SHULLER presses from Samara up to India and Germany. Each press weight amounted to 120 tons. The core challenge during deinstallation was that works were performed inside the facilities in the conditions of the restricted space, with no additional construction work. The dismantling was performed by means of the gantry system of 1000 ton capacity.
The cargoes were respectively delivered up to Kohl, Voerde (Germany) and Mumbai (India).